[1]
Y. Wang, “Analysis of the Influence of Tensioned Intervening Pipe on the Overall Performance of Deepwater Self-elevating Wellhead Platform”, SJT, vol. 8, no. 2, pp. 132–139, Feb. 2026, doi: 10.54691/kecqha70.