Wang, Y. (2026) “Synergistic Mechanism and Progressive Path of BIM Application in Historic Building Restoration: A Case Study of the Zhengyangmen Gate Tower Restoration Project”, Scientific Journal of Technology, 8(5), pp. 17–32. doi:10.54691/zxah0943.