Wang, Y. (2026). Synergistic Mechanism and Progressive Path of BIM Application in Historic Building Restoration: A Case Study of the Zhengyangmen Gate Tower Restoration Project. Scientific Journal of Technology, 8(5), 17-32. https://doi.org/10.54691/zxah0943