(1)
Wang, Y. Synergistic Mechanism and Progressive Path of BIM Application in Historic Building Restoration: A Case Study of the Zhengyangmen Gate Tower Restoration Project. SJT 2026, 8 (5), 17-32. https://doi.org/10.54691/zxah0943.