Optimization of the G Production Workshop Layout in T Company

Authors

  • Yuanxuan Wang School of Management, Southwest Petroleum University, Chengdu, Sichuan, 610500, China

DOI:

https://doi.org/10.54691/16xv6q35

Keywords:

Facility Layout Optimization; SLP; Logistics Analysis; Production Workshop.

Abstract

Based on an on-site investigation of the existing layout and production logistics of the G production workshop in T Company, this study identifies several problems, including disorganized material distribution and unreasonable process layout. To address these issues, the workshop layout is analyzed and optimized using the SLP (Systematic Layout Planning) method. The logistics and non-logistics relationships among different operating units are systematically analyzed, and a comprehensive relationship diagram and activity relationship diagram are developed accordingly. Finally, considering the actual physical space constraints of the workshop, an optimized layout scheme is proposed. The results show that the proposed layout effectively streamlines material handling routes and reduces material accumulation and stagnation between processes, thereby improving the rationality and efficiency of the workshop layout.

Downloads

Download data is not yet available.

References

[1] Dong, J. (2018). Layout optimization design of M company's compartment production workshop. Computer Knowledge and Technology, 14(12), 239–242.

[2] Yuan, W. Y., & He, A. H. (2023). Layout optimization research of the shirt production workshop of M garment company. Enterprise Science and Technology & Development, (3), 123–125.

[3] Yuan, W. Y., & He, A. H. (2023). Layout optimization research of the shirt production workshop of M garment company. Enterprise Science and Technology & Development, (3), 123–125.

[4] Chen, S. X. (2025). Research on layout optimization of lighting production line workshop based on SLP. Modern Industrial Economy and Informationization, 15(10), 243–246.

Downloads

Published

2026-09-21

Issue

Section

Articles

How to Cite

Wang, Y. (2026). Optimization of the G Production Workshop Layout in T Company. Scientific Journal of Technology, 8(9), 8-15. https://doi.org/10.54691/16xv6q35